Gas boiler plant in Forsbacka Gävle, Gästrike waste management.
New gas boiler for heating leachate at a SBR-plant.
The gas is distributed from the existing pressure increase-station down to the new treatment plant.
There we have designed and installed a heating plant for leachate treatment.
Equipment distrubitated and installed from Biogas systems.
Gas piping, condensation well with pump control, gas cooler, gas boiler, electric boiler with complete piping system as well as electricity and control to the superior system.
Supplier; Weishaupt. Gas burners and control cabuinets.
Client; Malmbergs Water AB
Sales/design 2022/2023
Buildstart: 2023-04
Final inspection: 2023-12
Order value: SEK 2,950,000
We have received several requests for design and development support. Several treatment plants want to rebuild existing old systems to meet EGN standards.
Sample pumping with analysis will be carried out in early autumn 2019.
Larger gas pipeline systems for landfill gas will be built at Ragnsell's plant in Högbytorp.
A new gas pipeline has been procured by Löfbergs Lila to a new warehouse in Välsviken.